Banner-Tien-Son-01
Banner-Tien-Son-02
Banner-Tien-Son-03

TECHNICAL INFRASTRUCTURE OF TIEN SON IP

Giao-thong-noi-bo

Internal traffic

– Tien Son Industrial Park is linked tonational road No. 1B by 4 geometry across points and 2 fly-over bridges.
– Traffic routes inside Industrial Parks are planned in square pattern, facilitating the entering into building areas.

Tram-dien

Power supply

Power is supplied from national grid through 110/22KV (35KV) transformer station with capacity of 1x40MVA and 1 x 63 MVA.

Nha-may-xu-ly-nuoc

Water supply & Drainage system

Water supply
Water treatment station with first phase capacity of 7,000m3/day.

Drainage system
Rain water drainage system separate to waste water drainage system.

Waste and waste water treatment

– Waste water treatment station with the first phase capacity is 4,000 m3/day. (Industry waste water is calculated by 80% of water supply volume).
– Waste from factories in the IP shall be categorized immediately in all factory and be collected to the centered treatment area of Bac Ninh Province.

Vien-thong

Telecommunication system – Internet

– Telecommunication system reach the international standard
– Underground cable system is connected directly to the fence of every factory.