Banner-Dong-Mai
Banner-Dong-Mai-01
Banner-Dong-Mai-02

TECHNICAL INFRASTRUCTURE OF DONG MAI IP

Giao-thong-KCM

Internal traffic

– The width of main roads with 2 lanes is 43 m and the branch road is 27 m and 15 m.
– The road of Industrial Park is designed to connect to Highway 18, which is convenient for transportation.

He-thong-dien

Power supply

Power is supplied from the national grid through 110/22KV, transformer station with capacity of 1 x 25 MVA and 1 x 16 MVA.

Water-station

Water supply & Drainage system

Water supply
– The Water supply Station has capacity of 6,500 m3/day/night.
– The diameter of water supply pipe is D100 mm to  D500mm.

Drainage system
Rain water drainage system is constructed separately with waste water drainage system in the IP. The diameter of underground rain-water drainage pipes D600 mm – D1000mm with the principle of automatic drainage.

Waste and waste water treatment

– Waste water treatment Station with capacity is 4,800 m3/day.(Industrial waste water is by 80% the quantity of water supply).
– The diameter of waste water drainage pipe is D300mm – D500mm
– Solid Waste from factories in the IP shall be categorized immediately in every factory and be collected to the centered treatment area of Quang Ninh Province.

Internet

Telecommunication system – Internet

– Telecommunication system reach the international standard
– Underground cable system is connected directly to the fence of every factory.