Slider-Yen-Phong-03
Slider-Yen-Phong01
Slide-Yen-Phong-ip
Slider-Yen-Phong-04

TECHNICAL INFRASTRUCTURE OF YEN PHONG IP

He-thong-GT-noi-bo

Internal traffic

– Yen Phong Industrial Park is connected to national road No.18 by 4 ways include 3 intersections traffic point.
– Main roads have two 80m lanes. Branch roads are 40m and 22m.

Tram-dien

Power supply

Power is supplied from national grid through 4 x 110/22KV transformer station with capacity of 9 x 63 MVA.

Cap-thoat-nuoc

Water supply & Drainage system

Water supply
– Water supply station of the first phase has capacity of 36,000m3/day and the second phase has capacity of 22,000m3/day.
– Water supply system is connected directly to the fence of enterprises.

Drainage system
– Rain water drainage system separate from waste water drainage system.
– The drainage pipe diameter with the principle of automatic drainage.

Waste and waste water treatment

– Waste water treatment station runs  with the 1st phase capacity 28,000 m3/day and second phase capacity of 12,000m3/day. (Industry waste water is calculated by 80% of water supply volume).
– Waste from factories in the IP shall be categorized immediately in all factory and be collected to the centered treatment area of Bac Ninh province.

CNG Supply

– CNG Supply: 90ton/day
– CNG Nitrogen Supply: 30 million m3/day

Vien-thong

Telecommunication system – Internet

A satellite switch board with 4,000 numbers, modern communication system reachs international standard and ready to meet full demands concerning on national and international communication services.